Posted: Thu Mar 19, 2020 10:21 pm
An independent 'Brighton, Lewes & Hastings Railway' was incorporated in 1844 to construct a 32.5 miles line from Brighton to Bulverhythe, 2.75 miles from Hastings?
A temporary terminus named "Bulverhythe" was opened on 27 June 1846, on a site near the 'Bull Inn' on the modern day A259 Bexhill Road, pending the construction of a bridge over the River Asten. The station remained open for just under six months, before the line was extended to a permanent station at St Leonards, West Marina, in November 1846.
West Marina Station was the nearest station to Hastings until 1851 when the Bo Peep tunnel through to Warrior Square and the tunnel to Hastings were completed.
Does anyone know why the first railway into Bulverhythe was initially constructed?
Clue - In 1823 annual horse races were established at Bulverhythe Salts, one of the finest racecourses in the UK in its day.
I take 'Salts' to mean salt marshes - which could be those that flood on all high tides or those that just flood on spring tides. Perhaps, historically, that was the case with the low lying land at Bulverhythe - the original racecourse, which was prone to flooding, and most probably relocated prior to the arrival of the railway
The horse-racing was so successful that in September 1826 the course was moved to 'South Saxons' at the bottom of Filsham Road and this allowed approximately 6,000 spectators a better view from the surrounding slopes.'
So, the railway first came to Hastings owing to the success of horse-racing at Bulverhythe and not to transport tourists to the seaside - that came later.
A temporary terminus named "Bulverhythe" was opened on 27 June 1846, on a site near the 'Bull Inn' on the modern day A259 Bexhill Road, pending the construction of a bridge over the River Asten. The station remained open for just under six months, before the line was extended to a permanent station at St Leonards, West Marina, in November 1846.
West Marina Station was the nearest station to Hastings until 1851 when the Bo Peep tunnel through to Warrior Square and the tunnel to Hastings were completed.
Does anyone know why the first railway into Bulverhythe was initially constructed?
Clue - In 1823 annual horse races were established at Bulverhythe Salts, one of the finest racecourses in the UK in its day.
I take 'Salts' to mean salt marshes - which could be those that flood on all high tides or those that just flood on spring tides. Perhaps, historically, that was the case with the low lying land at Bulverhythe - the original racecourse, which was prone to flooding, and most probably relocated prior to the arrival of the railway
The horse-racing was so successful that in September 1826 the course was moved to 'South Saxons' at the bottom of Filsham Road and this allowed approximately 6,000 spectators a better view from the surrounding slopes.'
So, the railway first came to Hastings owing to the success of horse-racing at Bulverhythe and not to transport tourists to the seaside - that came later.